BORDEAUX TRAMWAY
The tramway provides the Bordeaux metropolitan area with a mode of transport that matches its ambitions. The different routes meet clearly stated objectives: promoting economic dynamism, optimizing quality of life and enhancing the value of the areas crossed.
On the program:
Creation of the network core (Operational phase 1)
Successive extensions (Operational phases 2, 3 and 4)
Designing public spaces from facade to facade
Transport system, traffic plan, interchanges,
maintenance centers
Urban planning and environmental regulatory studies
Assistance with public consultation
Year
Since 1998 (start of the first studies)Team
Phases 1 to 3: successive groupings "GET", "TISYA" and then "TISYA2016"Systra (leader), Artelia, Ingerop, Verdi, Signes Paysages, EDP, BLP (co-contractors)
Phase 4: Artelia (leader), Signes Paysages, Signes Archi, SCE (co-contractors)
Location
Bordeaux Métropole (33)Project owner
Bordeaux Urban CommunityBordeaux Métropole
Mission
Complete project managementLinear
81kmAmount of work
Approx. 1.4 Md. € EXCL.Lines concerned
LINE A - La Gardette (Carbon-Blanc) or Dravemont (Floirac) to Haillan Rostand (Mérignac / Le Haillan) or Bordeaux Mérignac AirportLINE B - Berge de la Garonne (Bordeaux) to Pessac Centre or Pessac Alouette (Pessac)
LIGNE C - Parc des Expositions (Bordeaux) to Avenue des Pyrénées (Villenave d'Ornon)
LIGNE D - Quinconces (Bordeaux) to Cantinolle (Eysines)
Date: